Client: City of Baltimore
Location: Baltimore, MD 21230
Description: The Fort Avenue Bridge Project requires that the Fort Avenue Bridge, the only bridge that connects the Federal Hill neighborhood to the Fort McHenry area, be torn down and replaced.

Scope of Work:
  • Filterra Bioretention System
  • Inlets
  • Manholes
  • Grates

Associations